Test Scheduling

STABILITY SYSTEM provides many outstanding features to schedule stability testing:

Feature  Description 
Test scheduling Schedule tests to be performed within a specific time interval. Click to see a typical test scheduling report.
Laboratory submission forms Print blank report forms by study after scheduling testing. Also print blank report forms by study for unscheduled tests. If multiple laboratories are involved in testing for a stability study, print a separate blank report form for each laboratory according to the assignment in the test name table. Click here to see examples.
Multiple laboratory management Tests can be separated by performing laboratories. Click here to see an example.
Test backlog reporting A great laboratory management tool.
Edit test protocols at any time Edit the test schedule for existing stability studies even after the studies have begun.
Manage ICH backup condition Use the test only when required facility to manage the backup storage condition in which the samples are available, but the testing may be optional.
Adjust test dates due to malfunctioned storage chamber Adjust the scheduled test dates for the stability studies stored in a malfunctioned storage chamber to compensate for the time the chamber was out of service. All scheduled test dates on or after the date when the chamber went out of service are extended by a specified number of days.
Inactivate/activate studies easily Studies can be inactivated to speed up test scheduling.
Workload analysis and forecasting A great tool for budget preparation.
Label printing Labels can be printed based on the test scheduling. Click here for more information.